KEL Requires Project Engineers (Retd Hands Only) - 4 vacancies

KEL Requires Site Engineers - 20 vacancies

IOCL, Kochi conducted an Awareness Programme

M/s IOCL, Kochi conducted an Awareness Programme on Oil and Gas Conservation for the employees of KEL Mamala unit. General Manager Sri. A J Mathew inaugurated the function and Personnel Manager Sri. K K Rajeev welcomed the delegates from IOCL. Smt.Anjusha Vijay, Asst.Manager, IOCL handle the presentation part and Sri.Eldho Baby, Cheif Manager of the IOCL clarified the doubts of KEL employees regarding the subject.

IMG-20200211-WA0057
IMG-20200211-WA0058
IMG-20200212-WA0005
IMG-20200212-WA0006
IMG-20200211-WA0055
IMG-20200211-WA0054

Oorjakiran 2020

An Energy saving awareness class conducted at KEL Mamala Unit on 28-01-2020. The programme was inaugurated by Sri. A.J. Mathew, General Manager. Sri. K.K. Rajeev, Personal Manager welcomed all dignitaries and participants. Around 100 employees participated in the event. The Hand Book of this programme was inaugurated by GM giving a copy to Sri. K.G. Venugopal, Dy. GM. There was a video presentation and power point presentation . The programme was conducted by ‘SAFE’, Muvattupuzha.

IMG-20200128-WA0062
IMG-20200128-WA0059
IMG-20200128-WA0060
IMG-20200128-WA0063

Elevated exit bridge coming up at Sabarimala - KEL to build ₹21-cr. steel bridge in 18 months

sabarimalabridge1SABARIMALA PIC2

Elevated exit bridge coming up at Sabarimala The Travancore Devaswom Board (TDB) and the High Power Committee for implementation of Sabarimala Master Plan have finalised the proposal for an elevated exit bridge, linking Malikappuram with the Chandranandan Road, in an effort to ease congestion at the holy hillock, especially during rush days of the annual pilgrim season. The proposed exit bridge will stand at a height of 36 metres above the Bailey Bridge linking Malikappuram and Chandranandan Road. It will be a 326-metre-long, 10-metre-wide steel structure. The fly-over around the sanctum sanctorum of the Ayyappa temple would be demolished and the pilgrims would be directed to the temple sopanam through the main entrance of the temple. After the holy darshan, they would be diverted through the fly-over leading to the Malikappuram temple. With the completion of the proposed exit bridge, pilgrims need not return to the ValiyaNadapandal and the Lower Tirumuttom for their return journey. This would not only decongest the Lower Tirumuttom and the ValiyaNadapandal but also help the pilgrims to have a smooth holy darshan avoiding a long wait. The idea was to regulate the pilgrim flow through 13 self-contained queue complexes on the Saramkuthy path leading to the ValiyaNadapandal and from there to the Lower Tirumuttom to ascend the holy 18-steps. The exit bridge could also be utilised as an emergency evacuation route in case of an exigency. Kerala Electrical and Allied Engineering Company Limited(KEL) had been given the contract to construct the proposed exit bridge at an estimated cost of Rs.21 crore. The work on the proposed exit bridge in steel is expected to begin in January with a gestation period of 18 months.

Registered & Corporate Office:

Kerala Electrical & Allied Engg. Co. Ltd.
(A Government of Kerala Undertaking)
Mamala P.O., Kochi – 682305
Kerala, India

Ph : + 91 484 2310012 / 13 / 14

Fax: + 91 484 2310015

Email: info@kel.co.in

Website: www.kel.co.in

Trivandrum Office

TC-11/568, MBC-36, Museum Bains Compound, Kowdiar P.O, Trivandrum – 695 003,

Ph: 0471 2314287(Office)

0471-2310136(Chairman)

Email: tvm@kel.co.in

 

Copyright 2021 Kerala Electrical & Allied Engineering Co.Ltd. ©  All Rights Reserved
Powered by Technodreams